PTTEP, COOEC and MOGE jointly celebrate Load Out and Sail Away of WP4 Wellhead Platform destination to Zawtika Project

October 20, 2015
Save as PDF

Mr. Pairoj Rangponsumrit, Acting President and Chief Executive Officer, Executive Vice President, Production Asset Group, PTT Exploration and Production Public Company Limited (PTTEP), U Han Htoon, Director of Material Planning from Myanma Oil and Gas Enterprise (MOGE), and Mr. Zhou Xuezhong, Chief Executive Officer, Offshore Oil Engineering Company Limited (COOEC), together presided over the Load Out and Sail Away Ceremony for the WP4 Wellhead Platform which will sails to its destination at the Zawtika Project in Myanmar in November 2015. The ceremony was held at Tanggu Fabrication yard, the People’s Republic of China.

The WP4 platform is one out of four platforms that have been developed under Zawtika Phase 1B  Project, which achieved 3,000,000 man-hours without a Lost Time Incident (LTI).

Photo shows Mr. Pairoj (center), Mr. Zhou (left), and U Han Htoon (right) jointly presided over the ceremony.

For media enquiries, please contact Media Management Section.

The information, statements, forecasts and projections contained herein reflect the Company’s current views with respect to future events and financial performance. These views are based on assumptions subject to various risks. No assurance is given that these future events will occur, or that the Company’s future assumptions are correct. Actual results may differ materially from those projected.